Morrow Convention Center (Morrow, GA)
General Contractor: Batson-Cook Company
Completion Date: Nov 2009
This is a renovation project with new bathrooms and commercial kitchen. This is phase one of this design build project. See also HVAC project list.
Bartow County Jail Expansion (Cartersville, GA)
General Contractor: Peter R. Brown Construction
Completion Date: Nov 2010
This project is $2.2M bonded plumbing project which entails a new (8) level Inmate Housing Facility and renovations to the existing facility. The duration of this project is approximately 18 month project from inception to completion.
Gwinnett Math, Science & Tech High School (Lawrenceville, GA)
General Contractor: Carroll Daniel Construction
Completion Date: August 2009
This project is a 250k square foot, 5 building, renovation of the existing school and a 5 story new building that connects to the existing two schools. It consists of one floor of science lab rooms, a large commercial kitchen, setting of two 1500 gallon grease traps, test manholes, acid dilution tanks, and all the piping for the roof drains. Included in the plumbing is acid waste, gas, domestic water and waste. This is approximated to be an 18 month project, and the largest Gwinnett County School project to date.
Chattahoochee Technical College
General Contractor: The Facility Design Group
Completion Date: July 2009
This project is a two story college building including a large science lab area with acid, gas, waste and domestic water for all the lab tables and fume hoods.
North Metro Technical College (Acworth, GA)
General Contractor: The Facility Design Group
Completion Date: July 2009
This project is a two story college building including a large science lab area with acid water, gas, waste and domestic water for all of the lab tables and fume hoods. See also HVAC project list.
Marriott Hotel (Buckhead, GA)
General Contractor: Lanco-Nance
Completion Date: April 2009
Remodel/Conversion: Sheraton Hotel to Marriott. Project consists of complete HVAC demolition and renovation work in lobby and common areas and the relocation of the cooling tower. See also HVAC Project List.
Bay Creek Middle School Gwinnett Cty
Rogers Construction
Feb 2009
New Construction: Completing the installation of the plumbing system in this 145,000 sq. ft. school.
Hampton Inn (Lanett, AL)
General Contractor: Batson-Cook
Completion Date: January 2009
See also the HVAC project list. This project is a 5 story new hotel building that has 111 units. Some specialty fixtures included in some of these units are roll-in showers, Jacuzzi tubs, and bar sinks. This project also has a commercial laundry and a swimming pool.
Couch Middle School Gwinnett Cty
Rogers Construction
Jan 2009
New Construction: Completing the installation of the plumbing system in this 145,000 sq. ft. school.
The Strand Theatre (Marietta, GA)
General Contractor: de Oplossing
Completion Date: Oct 2008
Complete demolition and plumbing renovation in this historic theatre. All the plumbing was newly installed and included one small commercial kitchenette on each floor with a concession stand.
North Georgia College (Dahlonega, Ga)
Swofford Construction
Sep 2008
Overall contract value $500k. Poag Mechanical completed the new plumbing system in this historical 3 story building. Also, see HVAC project list.
Stork Gamco (Gainesville, GA)
General Contractor: The Facility Group
Completion Date: September 2008
This project was an addition to an existing equipment plant. This project included the basic plumbing system. There was a major compressed air system installed including a compressor, dryer, filter, and 350 gallon holding tank. From this 700 ft. of 3” Victaulic air lines with drops were ran. The sewer system went through a dual pump injector system, and the entire bay area trench and floor drains went through a 1500 gal. oil and sand separator. Also included was a high pressure commercial power washer unit.
Emerson Overlook (Marietta, Ga)
De Oplossing
Aug 2008
New Construction: Poag Mechanical completing installation of a new plumbing system in this 7 story retail and residential condominium.
Tip Top Chicken Processing Plant (Rockmart, GA)
Direct-to-Owner
Completion Date: July 2008
This is an expanding chicken production plant. We have done two major projects there with the remodel of their cooler rooms where we added all the floor drains needed. We installed stainless steel plumbing for air, hot and cold water, and high pressure water in their production line including related drains. In the main plant we installed floor drains, wall hung steam heaters, and emergency eye wash and shower units.
Cobb County Fire Station #5 (Atlanta, GA)
General Contractor: Batson-Cook
Completion Date: July 2008
Completed the plumbing on this new construction (2 bay) fire station in Cobb Count.
Orthopaedic South Surgery Clinic
KR Witwer
Feb 2008
Overall contract value $230k. Installed a new plumbing system.
Homestead Air Force Base (Homestead Fl)
Meco Builders
Jan 2008
Overall contract value $180k. Installed a new plumbing system. See also HVAC project list.

Downtown Marriott – Memphis, TN
Digney York
Nov 2007
Poag Mechanical replaced all of the plumbing fixtures in 250 guestrooms.
Gilmer County Library (Ellijay, Ga)
Headley Construction
Sep 2007
Poag Mechanical installed a new plumbing system in this building. See also HVAC project list.
Mill Springs Academy (Milton, Ga)
Osbourne and Assoc.
Sep 2007
Plumbing: Installed a new plumbing system.
Rabun County Hosp (Rabun Cty Ga)
Lusk and Associates
Aug 2007
Installed a new plumbing system in the existing hospital.

Comfort Inn (Blue Ridge, Ga)
Paris Construction
Aug 2007
Installed a new plumbing system in this 3 story Hotel.

Comfort Inn (Buford, Ga)
Paris Construction
July 2007
Installed a new plumbing system in this 3 story Hotel.
West Fannin Elementary (Blue Ridge, Ga)
Meco Builders
June 2007
Poag Mechanical installed the plumbing/utility system in this school addition.

Hyatt Tech Center – Denver, CO.
Digney York
June 2007
Poag Mechanical replaced all of the plumbing fixtures in 300 guestrooms.
Wellstar-Kennestone Clinic (Kennesaw, Ga)
Martin Gen’l Contracting
June 2007
Overall contract value $70k. Installation of a new plumbing system. See also HVAC project list.

Atlanta Airport Marriott
Graycor
Apr 2007
Overall contract value $1.9m. Poag Mechanical replaced the plumbing fixtures in over 600 restrooms and completed all necessary ADA upgrades. See also HVAC project list.

Hyatt Ivy Tower - Atlanta
Nix Unger
Feb 2007
Overall contract value $800k. Poag Mechanical replaced the plumbing fixtures in 200 restrooms, replaced all of the domestic water piping, and installed new isolation valves at each restroom. See also HVAC project list.
Pickens County Administrative Office
Nicorp Development
Feb 2007
Plumbing: Installed a new plumbing system in the old hospital
Athena Urology (Athens, Ga)
Burrson Construction
Jan 2007
Overall contract value $180k. Poag Mechanical installed a new plumbing system in this building. See also HVAC project list.
Piedmont Mountainside Clinic (Jasper, Ga)
Warren Hanks
Oct 2006
Poag Mechanical installed a new plumbing system. See also Medical Gas project list.
Dr. Tom and Susan Reilly Dental (Norcross, Ga)
Tech Services
Sep 2006
Overall contract value $32k. Installed a new plumbing system complete with medical plumbing that included 3 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
Sawnee EMC (Cummings, GA)
Ricks Contractors
Aug 2006
New Construction. Installed a new plumbing system in the new warehouse building and engineering building.
Oaks Assisted Living (Canton, Ga)
N & A Construction
Jul 2006
Plumbing: Installed a new plumbing system for a 93 bed facility.
Gwinnett County Public Safety Complex
Group VI
July 2006
New construction. Installed a new plumbing system inside the fire station and police precinct.

Appalachian Tech (Jasper, GA)
RW Allen
Jul 2006
Plumbing: Installed a new plumbing system in the new front addition and body shop.

Marriott Marquis – Atlanta
Graycor
April 2006
Poag Mechanical was the plumbing contractor on this project, the scope of work included the following: Forty-seven stories, 48 ADA restroom modifications, 127 suite modifications, and 1640 guestroom modifications, new tub and shower valves, new lavatories, new water closets, new bar sinks, new showers in ADA rooms.
Dr Golden Dental Office (Cumming, Ga)
Tech Services
Apr 2006
Overall contract value $22k. Installed a new plumbing system complete with medical plumbing that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
North Ga. MOB (Jasper, Ga)
Group VI
Feb 2004
Installed a new plumbing system in this 40,000 sq. ft. facility. Included multiple exam sinks, medical equipment, and numerous medical fixtures.
Gwinnett Dental (Gwinnett Cty, Ga)
Ahmir Shaazod
June 2002
Overall contract value $25k. Installed a new plumbing system complete with medical plumbing that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
Eric Pryor Dental Office (Jasper, Ga)
Price Davis
Apr 2002
Overall project value $36k. Installed a new plumbing system that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. |