Morrow Conference Center (Morrow, GA)
General Contractor: Batson-Cook
Completion Date: Nov 2009
This is a $550K mechanical project for the City of Morrow which renovates an existing building into a 50,000 sq.ft. conference center. The project is air side only with (3) RTUs and Power Induction Units serving the building. See also plumbing project list.
North Metro Technical College
New Health Education Building (Acworth, GA)
General Contractor: Facility Design Group
Complete Date: May 2009
The HVAC portion of this project consists of (2) above ground levels which include classrooms and laboratories. The system consists of a closed loop condenser water system with hot water serving 29 Water Source Heat Pumps. The equipment consists of (1) Evapo Cooling Tower, (29) Water Source Heat Pumps, (1) Raypac Heating Hot Water Boiler, (1) Heat Exchanger, pumps and a complete DDC controls system. The project is an approximate value of $900,000. See also plumbing project list.
Marriott Hotel (Buckhead, GA)
General Contractor: Lanco-Nase
Complete Date: Apr 2009
This Sheraton Hotel conversion was inclusive of adding four new Aaon 10 + Ton Roof Top Make Up Air Units, new Exhaust Fans, the relocation of a two cell BAC Cooling Tower and new sheet metal duct and air distribution throughout the hotel’s public areas including a partial kitchen renovation. See also plumbing project list.
Hampton Inn – (Lanett, AL)
General Contractor: Batson-Cook
Completion Date: Mar 2009
New Construction: Installed 111 PTAC units, two 30 Ton Make Up Air RTU’s, DDC Controls, Exhaust Fans refrigerant piping and sheet metal ductwork in this newly constructed five-story hotel. See also plumbing project list.
DuPont Carpet Fiber Testing Facility (Dalton, GA)
General Contractor: Robert E. Lamb, Inc.
Completion Date: Feb 2009
This project was inclusive of the installation of an HVAC to support the laboratory and office facility. The equipment for this project included installing (1) Aaon split system air conditioning serving the lab and (5) fans along with the duct system to accompany the equipment. Also a complete DDC controls system was installed. This project was approximately $210,000 in value.
Kennesaw State University Campus Buildings (Kennesaw, GA)
General Contractor: Samples Construction
Completion Date: February 2009
This installation is inclusive of three Indoor Air Handling Units, one Air Cooled Chiller, Mechanical Room Pumping Systems and Piping and the sheet metal ductwork and air distribution system.
Gilmer County Courthouse – Phase 2 Addition (Ellijay, GA)
General Contractor: Winter Construction Co.
Completion Date: Dec 2008
This multi-level facility included the installation of the following HVAC equipment and accessories. (3) Constant Volume Roof Top Units serving numerous terminal units with electric heat throughout the facility, (2) Mitsubishi Split System Air Conditioning Units, a number of fans along with a complete ductwork / air distribution system throughout. A new DDC controls system was installed to operate the new addition and connect to the existing Digital Controls system. This project was approximately $700,000 in value.
North Georgia College (Dahlonega, Ga)
Swofford Construction
Sept 2008
Overall contract value $500k. Poag Mechanical completed installation of 37 water source heat pumps, all new mechanical piping, controls, a new cooling tower, a new boiler, and all new air distribution. See also Plumbing project list.
Fort Lauderdale Grande
Digney York
Feb 2008
Poag Mechanical was the primary HVAC contractor on this project to renovate approximately 350 rooms. The Company contracted directly with the owner (XLR Luxury Resorts/ Blackstone). Primary work included the installation of 2 new air cooled chillers, 8 air handling units, 350 stacked vertical fan coil units, all new duct work, all new exhaust system, and a new DDC control system.

The W Hotel - Atlanta, Ga
Winter Construction
Feb 2008
Replaced 53 PIU units, installed a new DDC control system, installed all new air distribution, installed 3 new grease hoods with a new exhaust system. Work covered the hotel, the kitchen, and the Spa.
Orthopaedic South Surgery Clinic
KR Witwer
Feb 2008
Overall contract value $230k. Installed a new HVAC system. See also Plumbing and Medical Gas project lists.
Homestead Air Force Base (FL)
Meco Builders
Jan 2008
Overall contract value $180k. Installed a new 25 ton split system heat pump with double wall spiral ductwork in the new Warehouse building. See also Plumbing project list.

Courtyard Marriott (Ft. Lauderdale)
S&A Industries
Oct 2007
Poag Mechanical replaced the central chiller plant, the roof boilers, and the cooling tower. The Company also completed all sheet metal work on the renovation.
Gilmer County Library (Ellijay, Ga)
Headley Construction
Sept 2007
Overall contract value $330k. Poag Mechanical installed 14 new split system heat pumps, new controls, new air distribution, and a new exhaust system. See also Plumbing project list.
Wellstar-Kennestone Clinic (Kennesaw, Ga)
Martin Gen’l Contracting
June 2007
Overall contract value $70k. Installation of several VAV units, air distribution, and a new control system. See also Plumbing project list.

Atlanta Airport Marriott
Graycor
Apr 2007
Overall contract value $1.9m. Poag Mechanical replaced approximately 503 IEC stacked vertical fan coil units, all chilled/hot water piping, and added 2 new 6” chilled water supplies from the existing mechanical room. See also Plumbing project list.

Hyatt Ivy Tower - Atlanta
Nix Unger
Feb 2007
Overall contract value $800k. Poag Mechanical replaced the chilled water/hot water heat piping and sheet metal for 200 horizontal fan coil units. See also Plumbing project list.
Athena Urology (Athens, Ga)
Burrson Construction
Jan 2007
Overall contract value $180k. Poag Mechanical installed a new HVAC system complete with 1 new air cooled chiller, 2 AHU’s, a new mechanical piping system, and all new air distribution and controls. See also Plumbing project list. |